Video Testimonial · Tustin, CA

Full Pool Transformation in Tustin

A dated Tustin backyard rebuilt from the deck in: StoneScapes Aqua Cool mini pebble, travertine coping, new tile, an Angeles paver deck and all-new Jandy equipment. Watch the before and after.

Pool transformation in Tustin · 1:53

The Project at a Glance

Location
Tustin, CA
Project
Full pool and deck remodel
Finish
StoneScapes Aqua Cool mini pebble, custom blend
Tile
NPT Gneiss Lapis Blue with Fujiwa Glasstel 11 porcelain trim
Coping
Cordova Creme travertine
Deck
Angeles pavers, Courtyard style
Equipment
New plumbing and Jandy equipment
Watch time
1 minute 53 seconds

From Dated to Finished

This Tustin backyard needed more than a new surface. The old plaster had faded to a flat color, the concrete deck was cracked and worn, and the whole space felt dated next to the rest of the home.

It was handled as one coordinated job: demo of the old deck and interior finish, new plumbing and Jandy equipment, an Angeles Courtyard paver deck, Cordova Creme travertine coping, NPT Gneiss Lapis Blue waterline tile with a Fujiwa Glasstel 11 porcelain trim accent, and a StoneScapes Aqua Cool mini pebble finish.

A Custom Mini Pebble Blend

The finish was upgraded with crushed abalone shell and blue glass mixed into the aggregate, so it catches the light differently than a standard pebble finish. Mini pebble lasts roughly twice as long as white plaster, 15 to 20+ years, and its smaller, finer pebble stays comfortable underfoot.

Why Coping, Tile and Deck Were Done Together

Coping sits between the tile line and the deck, so it cannot be replaced on its own: new coping means new tile beneath it. With the coping coming out, renewing the deck in the same window was the efficient sequence. The pool was already drained and the area already staged, so nothing new had to be cut back into later.

See the full material list and a before-and-after slider on the Tustin pool remodel project page.

What We Did

  • Removed the old deck and interior finish
  • StoneScapes Aqua Cool mini pebble with abalone shell and blue glass
  • NPT Gneiss Lapis Blue waterline tile
  • Fujiwa Glasstel 11 porcelain trim tile
  • Cordova Creme travertine coping
  • Angeles Courtyard paver deck
  • New plumbing
  • New Jandy equipment

Photos From This Job

The Tustin pool before its remodel, with dated plaster and a plain concrete deck
Before · Dated plaster and a worn concrete deck
ACE Pool Repair & Remodel crew removing the old plaster inside the drained Tustin pool shell
During · The old finish coming out
ACE crew installing Angeles Courtyard pavers around the Tustin pool
During · Angeles Courtyard pavers going in
ACE crew troweling the StoneScapes Aqua Cool mini pebble finish onto the Tustin pool shell
During · The new mini pebble finish going on
Close-up of Cordova Creme travertine coping and NPT waterline tile on the finished Tustin pool
After · Travertine coping and waterline tile
Aerial view of the finished Tustin pool remodel with StoneScapes Aqua Cool mini pebble finish and Angeles paver deck
After · The finished pool and deck from above

Planning a Remodel Like This One?

Every remodel starts with an on-site visit to look at the finish, tile, coping and deck together.