ACE Pool Repair & Remodel · Orange County since 2014
Most of these calls open the exact same way. "Hi — my pool needs work."
That's it. That's the whole diagnosis. It's the pool equivalent of telling your doctor you feel bad and then waiting expectantly.
Which is fine, honestly. Working out what your pool needs is our job, not yours. But there's a real reason to sort it out before you start collecting quotes: resurfacing and remodeling are different projects. Ask three contractors for "a quote on my pool" without saying which one you mean and you'll get three numbers that have almost nothing to do with each other. Then you'll pick the lowest. And then you'll find out why it was the lowest.
So here's how to tell them apart, in the order we'd actually walk through it with you.
Resurfacing replaces the interior finish and nothing else. The plaster, pebble or quartz that the water touches comes off, new material goes on, done. Your tile stays. Your coping stays. Your deck, your equipment, the shape of the pool — all exactly where you left them.
A remodel is that plus whatever else you've decided to stop looking at. Tile, coping, decking, equipment, in some combination. It isn't a different technique so much as a bigger circle drawn around the same job.
The through-line: the problem stops at the surface. Look past the waterline and you're happy with what you see.
Here's the opinion we'll give you whether you ask for it or not: if your tile is original and your plaster is shot, resurfacing alone is a decision you'll regret in about a week. Not because the plaster will fail. Because you'll be standing there looking at the tile.
If that's where you're landing, the resurfacing & remodel hub lays out how the whole project runs, start to finish.
Stand at the shallow end and look at your backyard like you're about to sell the house. Then ask: is the pool surface the only thing letting it down?
If yes, resurface. If your eye keeps catching on the tile, the coping, the cracked deck, the equipment pad that looks like it was assembled by three different people over twenty years — that's a remodel, and pretending otherwise just means we'll be back sooner.
| Scope | Typical cost |
|---|---|
| Resurfacing only — white plaster, no upgrades | Starting at $9,850 |
| Partial remodel (resurfacing + decking or tile) | $15,000–$25,000 |
| Full remodel (finish + decking + tile + equipment) | $30,000–$70,000+ |
That $9,850 is where it starts: white plaster, no upgrades. It covers the whole job rather than just the finish — demo, traditional or hydroblast, plus return flush fittings, drain covers and full start-up service. Pebble and quartz move the number up from there.
Which brings up the thing worth saying plainly: if a quote comes in a lot below that, something has been left out of it. It's usually the demo or the start-up. Ask. A good contractor tells you straight; a bad one explains it in week three. For a fuller breakdown of what moves the number, we wrote a whole piece on what Orange County homeowners actually pay.
Resurfacing only: 5–7 days, drain to refill, then about a week of start-up while the water chemistry settles. We handle that part.
Add decking, tile or equipment and you're looking at 3–6 weeks, depending on scope. Permit requirements vary from city to city across Orange County. We pull them where the job needs them and deal with the inspections, so it isn't something you have to learn.
An empty pool with a crew already in it is the easiest your backyard will ever be to change. A Baja step, a set of deck jets, a spa, raising a deep end nobody has swum in since the nineties — all of it is far less disruptive now than as a standalone job in three years, when it means draining the pool again and cutting into a finish you just paid for.
You don't have to do any of it. But a few of these close off the moment work starts, so it's worth knowing what's on the table before the plaster goes on. We put the whole list in one place: pool upgrades worth considering, including which ones have to be decided first.
Send us a few photos of the pool and the deck and we'll tell you which one it is — including when the answer is "resurface it and leave the rest alone."
Call (909) 577-5274Start at the Pool Resurfacing & Remodel hub, or go straight to Resurfacing & Replaster or Full Pool Remodel. ACE serves Anaheim, Brea, Placentia, Fullerton, Chino Hills, Yorba Linda, Orange, Tustin, Santa Ana, Diamond Bar, La Habra, Huntington Beach, Irvine, Villa Park and the rest of Orange County. Licensed and insured, and an authorized Jandy dealer and warranty center — which means three years of warranty on the Jandy equipment we install.